Fabrica de Casetón el Porvenir
https://fabricadecasetonelporvenir.com Installation of consoles scaffolding, captures. Boards stack on the beams established in advance, then on them install consoles a scaffolding with an interval of 2 m and struts with a step of 3-4 m. In junctions of elements and strengthening designs fix captures.
Timbering installation on the basis. Struts at installation of boards put so that the heel leaned on the basis. A heel fix expansion bolt shields, a design level and by means of locks join to a timbering.
Installation of a scaffolding. On a ready timbering fix a scaffolding for builders: for this purpose on in advance installed consoles put a wooden flooring.
After the end of installation it is necessary to check quality of assembly, to be convinced that all elements are located correctly and reliably recorded.
How to choose a timbering of walls
The price of rent of a timbering of walls strongly varies: one set can be 3-4 times more expensive than another. The same concerns also characteristics: in the market it is presented as the reliable, well proved timbering, and production of doubtful quality. Not to make the wrong choice, pay attention to the next moments:
Rent of a timbering of walls
Existence of training instructions and technical documentation. First, it considerably simplifies installation process. Secondly, quality production always supplement with such documents.